Design & Plans Production Resources
- I-75 FRAME
- TSP 612 - ITS/ATMS Device Integration and Testing - 440900-2-52-01
- TSP 612 - ITS Device Integration and Testing - 441616-152-01
- TSP 690 - Connected Vehicle Equipment
- MSP 611 - As-Built
- MSP 670 - Controller Software Key
- MSP 671 - Controller Software Key
- MSP 685 - PDU
- Connected Vehicle Roadside Unit
- I - 75 US 27 to Alachua County Line
- Wekiva Section 7A
- Event Management Phase II Project
- I-95 Resurfacing from South of Dunn Ave to South of Airport Rd
- Cellular Communications for Traffic Signals
- 434407-1-52-01 Wireless Signal Interconnect Design
- Transit Signal Priority Phase 3
- Transit Signal Priority Phase 2
- Active Arterial Management Phase 1
- Active Arterial Management Phase 2
- Regional Integrated Corridor Management
- Example Project Plans and Details
- Districtwide ITS Maintenance
- Active Arterial Management Phase 1
- Active Arterial Management Phase 2
- I-75 from US 27 to the Alachua County Line
- Cabinet Details
- Clear Zone Detail
- Concrete Apron Detail
- Concrete Pole Data Sheet
- Directional Bore Detail
- Existing Microwave Tower Detail
- ITS Mounting Details
- Local Hub Ethernet Switch Detail
- Logical Network Diagram
- Project Notes
- Route Marker Detail
- Sediment Barrier Detail
- Splice Vault Detail
- Splicing Diagrams
- Stormwater Pollution Prevention Plan
- Wiring Diagrams
- Transit Signal Priority Phase 1
- Transit Signal Priority Phase 2
- Wekiva 7A
- Example Project Plans and Details
- Wrong Way Driving
- T633 - Multi-Conductor Communication Cable
- Wrong Way Driving (WWD) System Design Guidance
- 446159-1-52-01 MSP 660 Wrong Way Vehicle Detection System (WWVDS)
-
WWD Network Diagram
- PTMS / MVDS